logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2016.01.28 2013가합565239
하자보수보증금 등
Text

The plaintiff's lawsuit against defendant Sam-ho is dismissed.

2. Defendant Construction Mutual Aid Association shall be the Plaintiff on 286,434.

Reasons

Basic Facts

The status of the parties is the autonomous management body that consists of the occupants in order to manage the 9-dong 378 apartment units in the e-Saeman-dong 678, Incheon Metropolitan City (hereinafter referred to as the “instant apartment”).

The Siju Development Co., Ltd. (hereinafter referred to as the "Yju Development") is a project proprietor who constructed and sold the apartment of this case, and the defendant Samho Co., Ltd. (hereinafter referred to as the "Defendant Samho") is a contractor who has contracted the construction of the apartment of this case from the development of the present state.

Defendant Construction Mutual Aid Association guaranteed the duty to repair the defects in the apartment of this case by Defendant 3.

Around June 26, 2007, Defendant Construction Mutual Aid Association entered into a contract for the warranty of defects (hereinafter “instant warranty contract”) under which the warranty contractor shall pay the warranty bond within the period and amount specified in the detailed statement of the execution of the warranty contract under the following contract in the case where the warranty contractor fails to perform the warranty obligation upon receiving a request for the repair of defects (excluding non-construction parts or design defects before the inspection of the use) that have occurred after the date of the inspection, as the construction of the instant apartment in the execution of the new construction of the instant apartment between Defendant C and the Defendant C, and Defendant C entered into a contract for the warranty of defects (hereinafter “instant warranty contract”) with the relevant warranty contractor. Defendant C issued a written warranty bond stating the details of the execution of the warranty contract under the following by the Defendant Construction Mutual Aid Association and deposited it with the relevant Mayor, which is the authority for the inspection of the representative council or the management body

The warranty period for the name of each type of work (won) 32803 columns, bearing walls from July 25, 2007 to July 24, 2017 (10 years) 273, 961, 242309, 339, 270 74406 " from July 25, 2007 to July 24, 2017 (10 years) 35,378,028 additional 32804 square meters from July 25, 2017, the floor, roof, and roof on July 25, 2007 to July 24, 2012 (5) 273,961.

arrow