logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 광주지방법원 2015.11.05 2012가합52993
손해배상
Text

1. The Defendants jointly do so to Plaintiff A, 346,54,365 won, and Plaintiff B 18,000,000 won, and Plaintiff C, D, and E.

Reasons

1. Basic facts

A. The relationship between the parties 1) Defendant F is the police assigned for special guard belonging to the Defendant G-gun, who was stationed in the G-based water intake site located in the former G-based I from March 2007 and was in charge of the management and operation of the water intake site. Defendant H is the Defendant Korea Electrical Safety Corporation (hereinafter “Defendant Corporation”).

(2) On July 28, 2009, the Plaintiff A is the representative director of K Co., Ltd. (hereinafter “K”) who received a contract from the Defendant G-gun for the construction of electric facilities, such as the source pumps and distribution teams, which were flooded on July 28, 2009, while serving in the JeonnamJ. The Plaintiff A’s spouse, the Plaintiff C’s mother, the Plaintiff D, and the Plaintiff’s children are the Plaintiff’s children.

B. Plaintiff A’s electric shock accident (A) The structure of the water intake plant is located outside the water pumps, and the high voltage power distribution team (3300V) is installed inside the water pumps and connected to the four pumps through the four pumps.

B) The main power distribution team for the four pumps that supply electricity to the above four pumps is supplied with electricity from the main power distribution team connected to the main power distribution team, and the main power distribution team is supplied with electricity from the external power distribution facility. C) Accordingly, the main power distribution team for the four pumps can suspend the supply of electricity by cutting the connection with the main power distribution team. However, the main power distribution team may suspend the supply of electricity from the power distribution facility outside the main office.

2. On July 27, 2009, the flood K in the pumps room received a request from Defendant G-gun to replace the water valves in the G Intake-water reservoir. On the same day, the construction of a base-breaking for the replacement of valves was conducted on the same day. On July 28, 2009 following the day, the valves exposed to a large number of a base-breaking construction works were destroyed without checking the pressure of water pressure, and water flows out or the pump flows out with damaged parts.

arrow