(영문) 서울중앙지방법원 2019.05.17 2016가합19898
근로에관한 소송
Text

1. The Defendant shall pay to the Plaintiff KRW 58,239,308 and the interest rate of KRW 15% per annum from April 20, 2019 to the date of complete payment.

Reasons

1. Basic facts

A. The status of the parties 1) The Defendant (C Co., Ltd.) (hereinafter “C Co., Ltd.”) changed from March 24, 2017 to the present trade name.

“Defendant,” regardless of whether it was before or after the change in the trade name;

(2) A corporation H (hereinafter “H”) is a corporation established for the purpose of manufacturing, distributing, etc. cement products, which engages in the business of crushinging stone and old soil mined from C, E, and F in G, and then manufacturing and selling cement in the Defendant’s three-dimensional plant. 2) A limited liability company H (hereinafter “H”) is a company that performed the business of checking, cleaning, cement shipping, etc. of cement production from the Defendant.

3) The Plaintiff entered into a labor contract with H on June 1, 200 and worked at the Defendant’s three-way plant from that time, and retired from H on December 31, 2016. (B) An overview of the Defendant’s cement manufacturing process is divided into “the completion of the production process of the raw materials from metal mining process and the shipment process.”

Specific duties by process shall be as follows:

The details of the specific work of the process are the stage of extracting tin stone and elderly soil, which is the main raw material of cement process, in E owned by the Defendant, D, F and I Co., Ltd., a subsidiary of the Defendant (hereinafter referred to as “I”).

우선 석회석 등의 시료를 채취하여 착암(鑿巖) 지점을 선정한 후 착암, 발파 등을 거쳐 채굴한다.

채광된 석회석은 조쇄기(粗碎機, 크러셔, Crusher)에서 조쇄된다.

On the other hand, the phase prior to the reform after sunlighting is focused, which consists of the loading and transportation of dump stones, etc. to be loaded in the dump season using excavating devices, dump trucks, etc., and arrangement for the removal of dust.

The order of work, etc. shall be arranged as follows:

In mining (e.g., tampling of heavy dusts and other tampling of loading and transporting of first cancers, and trawstones which have been tighted in the process of raw materials for oil, shall be used as raw materials by Stackers.