logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2015.05.28 2013나66330
손해배상(자)
Text

1. The part against the plaintiff corresponding to the money ordered to be paid under the judgment of the court of first instance shall be revoked.

The defendant.

Reasons

1. Occurrence of liability for damages;

A. The facts of recognition (1) D, around 07:20 on December 25, 2010, when driving a Hexton car (hereinafter “Defendant vehicle”) and driving the G road in front of the G in F at the time of Pakistan into a mine mine protection area from the gold village, due to the negligence of the central line, and the part of the front part of the Hbter II vehicle driven by the Plaintiff in the adjacent part was shocked by the front part of the Defendant vehicle, and caused the Plaintiff to suffer an injury, such as the alley of the front part of the Defendant vehicle.

(2) The Defendant is an insurer who entered into a comprehensive automobile insurance contract with respect to the Defendant’s vehicle.

[Ground of recognition] Facts without dispute, Gap evidence 2, Gap evidence 7-1 to 9, the purport of the whole pleadings

B. According to the above fact of recognition of liability, the defendant is liable to compensate the damage suffered by the plaintiff due to the accident of this case as the insurer of the defendant vehicle.

2. In addition to the matters stated below within the scope of liability for damages, each corresponding item of the Schedule of Calculation of Compensation for Damages shall be as follows, and in principle, the period for the convenience of calculation shall be calculated on a monthly basis, but less than the last month and less than KRW 1 shall be discarded.

The calculation of the current value at the time of the accident shall be based on the reduction rate of 5/12 percent per month to deduct the interim interest.

In addition, it is rejected that the parties' arguments are not stated separately.

Personal information of KRW 57,711,008: 57,708: 2) Income and operating period as stated in the “basic matters” list of the amount of compensation for damages attached hereto: 2) Income and operating period: Urban Daily Wage of an ordinary worker; 3) the rate of loss of labor capacity due to the aftermath disorder (1) the rate of loss of labor capacity due to the aftermath disorder (22) the number of operating days; 3) the rate of loss of labor capacity due to the 60 years old; 17) the rate of loss of labor capacity due to the math disorder (1) the left-hand non-fast disorder damage; 17) the permanent disability (2) the rate of loss of labor ability due to Mabrid disability assessment Table 2-B-B, and occupational coefficient 3).

arrow