(영문) 수원지방법원 2016.05.27 2013가합29328
공사대금
Text

1. The plaintiff's claims against the defendants are all dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Facts of recognition;

A. Defendant A corporation (hereinafter “Defendant A corporation”) shall be listed in attached Table 2 A.

On the surface of the real estate indicated above, the following construction contracts (hereinafter referred to as the “instant contract”) were concluded on June 15, 2012: (a) the Plaintiff and the instant construction cost of KRW 4,082,850,000,000 for the construction cost of the Kim Processing Industry (the subsidy of KRW 2.4 billion, the self-charge of KRW 1.6 billion) were selected as a subsidy recipient of the subsidized project for the fishery product processing industry promotion project project with the content that the Kim Processing Factory is newly constructed, satched, and satched and dried, (hereinafter referred to as the “instant construction project”).

The name of a construction project: Advance payment of value-added tax of KRW 371,168,182, and KRW 200,00,00 for the construction work period for the new construction of processing facilities from June 15, 2012 to October 30, 2012 for A Kim Processing Factory (the first floor, the second floor, the second floor, the second floor, the second floor: 20% after the completion of the construction work for the first floor, and 20% within one month after the completion of the construction work for the remaining construction period.

B. After concluding the instant contract with the Defendant corporation, the Plaintiff entered into a contract with the machinery and equipment business operator receiving the instant plant supply of the plant machinery and equipment as the instant factory. The main contents of the contract are as follows. In addition, the Plaintiff entered into a contract with D and D purchase contract for machinery and equipment, such as installation of moisture, etc., and D and D and D.

1. Contract item E: Contract amount of Class 38 packing machines, other than three-dimensional packing machines: 1,507,000,000: Contract amount: 450,000,000 intermediate payments; intermediate payments of KRW 8,000,000 on September 20, 2012; and 1,000,000 on October 257, 2012; and 257,00,000,000 if the price of the goods is fully paid, the supplier shall have ownership and right to possession if the person who is supplied with the goods fails to fulfill the above payment condition.