(영문) 서울중앙지방법원 2015.03.18 2014가합562053
공사대금
Text

1. The Defendant’s KRW 1,083,022,490 and KRW 317,723,450 among the Plaintiff and KRW 230,89,340 from August 1, 2013.

Reasons

1. Basic facts

A. Both construction companies (hereinafter “bridge construction”) and Defendant and four other companies are the members of a joint supply and demand organization (hereinafter “instant joint supply and demand organization”) that receives a contract for construction works of HS, South High-speed Speed No. 4-2 Section, Nowon-gu Speed No. 4-2 Section, and other construction works (hereinafter “instant prime contractor”) ordered by the Korea Rail Network Authority by joint performance method, and the Plaintiff is the subcontractors who received a contract for the fence and railing works (hereinafter “instant fence construction”) from the representative of the instant joint supply and demand organization (hereinafter “the instant joint supply and demand organization”).

B. Around October 2011, the Plaintiff entered into a contract to accept the instant fence construction and the instant fence. After that, the Plaintiff and Duna Construction concluded a contract to change the construction cost on several occasions and finally set the construction cost at KRW 1,621,13,140.

(hereinafter referred to as the “instant First Contract”) C.

On October 2011, the Plaintiff entered into a contract to accept the instant soundproofing wall construction and the instant soundproofing wall construction. After that, the Plaintiff and Duna Construction concluded a contract to change the construction cost into several times, and finally set the construction cost at KRW 1,420,560,680.

(1) The term “the instant contract” is “the two contracts,” and “the instant contract” as stated above. The instant contract and “the instant contract”). The term “the progress payment” as of the date of classification is non-paid and the fence construction work (the instant contract) is as of July 31, 2013, and the fence materials of the instant case are installed on August 31, 2013, 196,272,340 fences on August 31, 2013, 31, 196, 272, 340 fences and fences on October 31, 2013, 200, 300,000,000,000 fences and fences on October 31, 2013, 200,91,91,420 fences and fences on April 30, 2014, 207, 2047.