logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 전주지방법원 2020.09.09 2019가단19032
토지인도 등
Text

1. The Defendant indicated in the attached Form No. 1, 2, 3, 4, 5, 20, 19, 18, among forest land B 1,006 square meters in Jeonjin-gu Seoul Special Metropolitan City.

Reasons

1) On August 31, 2009, the Plaintiff completed the registration of ownership transfer on the ground of inheritance on May 14, 2008 with respect to 1,006 square meters of land B and C and 192 square meters of forest land in Seongdong-gu, Seoul on August 31, 2009. 2) on the ground of the consultation division, the registration of ownership transfer is completed on May 14, 2008. 2) on the attached table No. 1, 2, 3, 4, 5, 20, 20, 19, 18, and 113 square meters of land inside the ship (hereinafter “instant subparagraph (a)”) connected with each of the following points in order: (a) a concrete package (hereinafter “instant road”); (b) a ditch with 2,14, 15, 16, and 17 square meters of land; and (c) a ditch with 14,000 square meters of land (hereinafter “14, 16,20000 square meters of land”).

3) The ditches (b) on the part (f) on the part (f) of 26 square meters connected in order to each point of 32,27,28,31, and 32 indicated in the same drawing among the area of 192 square meters of land in Seojin-gu Seoul Special Metropolitan City, Jeonjin-gu, Seoul Special Metropolitan City, shall be deemed as the ditches (hereinafter “instant (F)

[4] There was a long period of time in each of the above lands owned by the Plaintiff, and the Defendant, around May 2019, opened the instant (A) road along with the extension of the said farmland around May 2019, and packed it into concrete. The maintenance work, such as installing a chest on the instant (B), (c), and (c) ditches among the existing drainage, was conducted, and the parts of the instant (A) road, (b), (c), and (c) ditches are occupied by the date of closing the pleadings of the instant case.

[Grounds for recognition] The facts without dispute, Gap evidence 1-1 and 2, each entry in this Court's request for surveying and appraisal as of December 19, 2019 against the principal branch office of the Korea Land Information Corporation, and the purport of the entire pleadings of this case, (a) roads, (b) ditches, and (c) ditches.

arrow