Text
1. Design and construction contract for the three-sex points entered into between the Plaintiff (Counterclaim Defendant) and the Defendant (Counterclaim Plaintiff).
Reasons
A principal lawsuit and a counterclaim shall be deemed simultaneously.
1. Basic facts
A. The status of the parties is that the Plaintiff is a company engaged in the manufacture, sale, and export and import of cosmetics, and the Defendant is a company engaged in interior design and design business, interior construction and supervision business, and construction business.
B. On July 2017, the Defendant, upon consultation with the Plaintiff, has completed the process of interior works for the same-sex store (hereinafter “instant building”). The Defendant is a building on D ground in Daegu-gu, Daegu-gu (hereinafter “instant building”).
(C) include C same-sex-sexs (hereinafter referred to as “C same-sexs”).
(2) From February 21, 2018 to February 2018, the Defendant started design and design work for opening the interior of the instant building, and performed the said work until February 2, 2018. The Defendant demanded that the Plaintiff complete the interior of the interior of the instant building (hereinafter “instant construction”) from March 21, 2018, and removed materials, etc. attached to the inside and outside of the instant building, the number of underground floors leakage, the number of floors leakages, the construction of the first floor and the stairs, and the distribution pipeline work.
3) On February 27, 2018, the Defendant issued a written estimate on the instant construction project (hereinafter “the first written estimate”) to the Plaintiff.
(1) The Defendant sent a written estimate (hereinafter referred to as “the second written estimate”) that reflects the cost of materials reduced due to a change in floor materials, etc. on March 9, 2018, the construction cost of the instant construction was KRW 490,000,000 (excluding value-added tax) in the written estimate.
(4) On March 9, 2018, when the instant construction is in progress, the Plaintiff requested the Defendant to suspend the construction, and demanded the Defendant to calculate and submit the design cost for the same-sex store.
5 On April 19, 2018, the Plaintiff ordered the Defendant to remove the temporary structures installed around the instant building for the instant construction, and the Defendant removed the said temporary structures.
C. The plaintiff's deposit.