Text
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
Basic Facts
The title of the instant patent invention (Evidence 2) invention: C filing date (the filing date of the JJ of the patent application of the Republic of Korea to the original applicant of the instant patent invention as of the base date, and the instant patent invention is a divisional application of the said original application)/registration date/registration number: D (E)/F/G inventor and the applicant/final right holder: H/Defendant “H” on August 3, 2015.
(Evidence A No. 1). On the summary C of the invention
(001) In the past, since the type of wheelchairs is different according to the size of each type of wheel, I has a slick rate size corresponding to the size of each type of wheel, and according to I has a problem that it is difficult to select and apply it according to the size of wheel when mixing with each wheel, even if I produce it in accordance with the size of each wheel, so there is a problem that it is difficult to select and apply it in line with the size of wheel when mixing it. Therefore, there is no separate means to narrow the size of the connecting part because the smoke and slickness of the connecting part is reduced, and as a result, there is a problem such as reduction in the slick size of the connecting part, decrease in contact with the other wheel, decrease in contact with the other wheel, etc.
(011) The purpose of providing C is not only to facilitate the installation of the main spons, but also to promote the increase in contact with wheel chairss and the improvement of their contact strengths, as the area of the connecting becomes narrow as much as possible, so that flexibility and sponsability of the length direction of the connecting part can be improved, and as a result, the installation of the main spons through the main spons, as well as to facilitate the installation of the main spons.
(No. (0012). In order to narrow the width of each connecting part located on both sides of the dunes of the main body of wait, the additional line and auxiliary line shall be added to both parts of the dunes of the main body of wait and the head office of each main body of wait.
(St. (0012) . I shall have the main body of wait (10) and multiple structure of wait.