1. The defendant shall be the plaintiff.
A. Of the buildings listed in paragraph 3 of the attached list of real estate in attached Form 1, the appraisal of the first underground floor shall also be marked 10.
Reasons
1. Facts of recognition;
A. Construction Co., Ltd. (hereinafter “Building”) (hereinafter “Building”) in the annexed List 1 and 2, 1)
(2) On September 20, 2007, each land listed in paragraphs (1) and (2) of the attached Table Nos. 1 of the annexed Table No. 2007 (hereinafter the above land is referred to as “instant land”; and each of the above land is referred to as “each of the instant land” in total.
) A steel framed and 2-story sales building located on the ground of the instant land (hereinafter “Gu building”) and the instant C building
(2) On the same day after purchase, Han Bank Co., Ltd. (hereinafter “I Bank”) made a loan of KRW 6,700,000 on September 20, 207, with a loan of KRW 6,700,000,000, and completed the registration of the transfer of ownership under its own name. The registration of the joint collateral security (hereinafter “joint collateral security”) was completed with respect to the instant land as joint collateral, with the maximum debt amount of KRW 9,490,000,000 for the instant land and its ground as joint collateral, and the joint collateral security (hereinafter “instant joint collateral security”) was completed with respect to the instant land as of March 18, 208, by adding the instant D land to the joint collateral security (hereinafter collectively referred to as “instant loan”). The joint collateral security (hereinafter referred to as “the aforementioned joint collateral security”). As to the instant land as of the same day, the joint collateral security (hereinafter referred to as “the joint collateral security”).
3) Construction of the instant building is to remove the building on the ground of the instant land, and buildings, such as the first floor underground of the reinforced concrete structure and the first and second-class neighborhood living facilities of the fifth floor above the ground, on the land of Incheon Gyeyang-gu, Incheon E and F, adjacent to each of the instant land and its neighboring land (hereinafter “new building of this case”).
Around September 19, 2008, the new building construction of this case (hereinafter “instant construction”) was decided to be newly built.
The building of the instant land C was removed by starting the construction of the building, and the construction of the building was completed on January 12, 201.
B. Each land and new building of this case