(영문) 춘천지방법원 원주지원 2018.11.28 2016가단37203
공사대금
Text

1. The defendant,

A. At the same time, 17,150,000 won shall be paid to the Plaintiff at KRW 17,150,000.

Reasons

1. Basic facts

A. On October 6, 2015, the Plaintiff concluded a contract for construction work (hereinafter “instant contract”) on the land owned by the Defendant and the Defendant, setting the construction cost as KRW 224,200,00 with respect to the construction work for the construction work of constructing a neighborhood living facility and housing with the second floor above ground (hereinafter “instant housing”) on the land owned by the Defendant and the Defendant (hereinafter “instant construction work”).

Serial Payment Date: (a) deposit in the account in the name of E (D) name on October 30, 2015 in the payment method of KRW 60,000,000 (Plaintiff’s wife) deposit on October 6, 2015; (b) deposit in the account in the name of E (D) name on October 30, 2015; and (c) deposit in the account in the name of F (Plaintiff’s child) name on December 24, 2015; (d) deposit in the name of F (Plaintiff’s child) name on February 39, 2016; and (e) deposit in the account in the name of F (Plaintiff’s child) name of 50,000,000 won on April 5, 2016; and (e) deposit in the account in the name of 208,387,610 won on April 37, 2016.

B. Under the instant contract, the Defendant deposited the construction cost of KRW 208,387,610 to the Plaintiff as follows:

C. The instant house was approved on September 20, 2016, and the Plaintiff transferred the instant house to the Defendant.

[Ground of recognition] Facts without dispute, Gap evidence 1, 3 evidence, Eul evidence 1 and 3 (including numbers; hereinafter the same shall apply), witness D's testimony, the purport of the whole pleadings

2. The parties' assertion

A. The Plaintiff’s assertion 1) At the Defendant’s request, the Plaintiff additionally bears industrial accident insurance premium, construction design cost, and completion cleaning cost in addition to the instant construction work. The Plaintiff’s present text, civil engineering light (such as equipment, turf, turf, and reconstruction due to natural disasters) and the watering field, the watering field, the watering system, the electric measuring apparatus, the gas equipment, the gas equipment, the turphone, the turphone and the security construction

(2) The Defendant paid 30,000,000 won to D on October 30, 2015 without the Plaintiff’s consent, and thus, it cannot be recognized as the construction cost.

However, D above KRW 15,00,000 out of the above KRW 30,000,000 shall be the Plaintiff.