logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2017.11.03 2016가단5278527
손해배상(자)
Text

1. The Defendant’s KRW 54,118,403 as well as the Plaintiff’s annual rate from May 28, 2014 to November 3, 2017.

Reasons

1. Occurrence of liability for damages;

A. The facts of recognition 1) B are as follows: B, May 28, 2014, 2011:30 C, a private taxi (hereinafter “Defendant vehicle”).

2) On the other hand, the Plaintiff’s vehicle was driven by the Defendant’s vehicle, and the Defendant’s vehicle was driven by the Defendant’s vehicle in the direction of the school club in the direction of the school club in the direction of the school club in Gangnam-gu, Seoul, along with five-lanes of the 5-lanes of the 5-lanes of the 5-lanes of the 546-lanes of the 5-lanes of the 5-lanes of the 5-lanes of the 5-lanes of the 5-lanes of the 5-lanes of the 5-lanes of the 5-lanes of the 5-

(2) The Defendant is a mutual aid business operator who entered into a motor vehicle mutual aid contract for the Defendant’s vehicle.

[Ground of recognition] Facts without dispute, Gap 1 and 2 evidence, purport of the whole pleadings

B. According to the facts of recognition of liability, the defendant who is a mutual aid business operator is liable to compensate the plaintiff for the damages caused by the accident in this case.

2. In addition to the matters stated below within the scope of liability for damages, each corresponding item of the Schedule of Calculation of Compensation for Damages shall be as follows, and in principle, the period for the convenience of calculation shall be calculated on a monthly basis, but less than the last month and less than KRW 1 shall be discarded.

The calculation of the current value at the time of the accident shall be based on the reduction rate of 5/12 percent per month to deduct the interim interest.

In addition, it is rejected that the parties' arguments are not stated separately.

Personal information 1) Personal data: as stated in the column for the “basic matters” in the attached Table for calculation of damages: Urban Daily Wage, 22-day work from the date of the accident, 3-day work from the date of the accident, 5-day work on January 5, 2016) residual disability (excluding a fixed outdoor department) ① Rate 9% of the labor ability loss due to the bypassing the left, 2% of the permanent disability, 10% of the labor capacity loss due to the bypassing the right, 10% of the permanent disability, 2% of the labor capacity loss due to the bypassing the right, 1. From May 28, 2014 to January 5, 2016.

arrow