logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2015.11.11 2015가합503921
공사대금
Text

1. The Defendant (Counterclaim Plaintiff) is jointly and severally liable to the Plaintiff (Counterclaim Defendant) for KRW 46,300,000 and Defendant B against this.

Reasons

A principal lawsuit and a counterclaim shall be deemed simultaneously.

1. Basic facts

A. On May 27, 2013, Defendant C is an urban-type residential housing (hereinafter “instant building”) on the land of Guro-gu Seoul, E, F, G, and H on May 27, 2013.

2) The 3rd General Construction Co., Ltd., Ltd. (hereinafter referred to as “Trified General Construction”).

(A) The construction cost was KRW 620,466,00 for the construction period and the construction period was determined from May 27, 2013 to December 31, 2013. Defendant B is an urban-type residential house on May 30, 2013 and J land (hereinafter “operation among the instant buildings”).

(2) The construction cost of construction work was set at KRW 880,00,000 for 30,000 and the construction period was set from May 26, 2013 to December 31, 2013 (hereinafter referred to as the “instant two houses”) and the construction work to build the instant building is called the “new construction work.”

30,00,00 square meters of construction cost (cost and equipment cost) 4,530,00 electrical construction (cost and equipment cost) 11,60,00,000 sewerage (CCTV photography and all other documents) 1,60,000 elevator construction (part reinforcement work) 5,00,000 urban gas construction (part reinforcement work) 1,50,000,000 tree installation work (cost and personnel cost) 30,000,000 square meters (18 households), 7,80,000,000 landscaping work (with 7,50,000,000,000, 30,000,000, 30,000,000, 30,000,00, 304,000, 30,000, 304, 10,000, 201, 36,74, 201,2

[Attachment] Defendant 3’s statement of the instant subcontract.

arrow