(영문) 서울중앙지방법원 2017.05.12 2016가단5027163
구상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Facts of recognition;

A. The Plaintiff is an insurance company under which the insurance period from January 28, 2013 to January 28, 2014, the Plaintiff entered into a contract for employer liability insurance (hereinafter “instant insurance contract”) that covers losses by setting the insured as the non-party company and bearing legal liability for damages exceeding the amount of accident compensation paid under the Industrial Accident Compensation Insurance Act due to an occupational accident that occurred to the said company.

B. On December 18, 2013, the non-party company was receiving sewage for the construction of safety facilities for the construction of new apartment building B in Busan Northern-gu, Busan, and around 15:30 on December 18, 2013, C, an employee of the non-party company, is a network installed to prevent damage caused by the falling of materials, tools, etc. according to the construction guidelines for the installation of the falling-water prevention network pursuant to Article 27 of the Industrial Safety and Health Act.

During the installation of a maternal part, J-Bolt (hereinafter referred to as the “instant V”) cut down and fell below 6.8 meters from each other, resulting in serious injury, such as cutting down in a satise satise satise satise, pulverging in a satise of satise satise.

(hereinafter referred to as “instant accident”). C.

The defendant runs wholesale and retail business with the trade name of "D" in relation to V, steel products, and miscellaneous goods.

The Defendant purchased a connection width and scarV from another company, and produced the instant V by combining it through presspunching work, and supplied it to the Nonparty company at KRW 1,500 per dog.

On March 27, 2015, the Plaintiff exceeds C the amount of accident compensation under the Industrial Accident Compensation Insurance Act of KRW 143 million based on the content of damage evaluation report.