Text
1. The Defendant’s KRW 81,601,77 of the Plaintiff and its related KRW 5% per annum from August 5, 2013 to July 18, 2017.
Reasons
1. Facts of recognition;
A. On March 2013, the Defendant installed and managed the signal apparatus at the entrance distance of the house (hereinafter “the instant shooting distance”) at the south-dong-dong 587, and requested the Korea Electrical Safety Corporation to conduct a regular inspection of the traffic safety facilities, including the traffic signals, etc. installed at the Namyang-dong-si.
B. On August 5, 2013, around 15:00, the Plaintiff driven a B car (hereinafter “Plaintiff’s car”) in accordance with the left-hand turn from the private distance of this case and made a left-hand turn to the left-hand turn. However, there was an accident in which the part of the driver’s seat of Plaintiff’s car and the part of the driver’s seat of the Plaintiff’s car are concealed on the front left-hand side of the numberless truck (hereinafter “instant accident”), which was directly located in the police station in Jyang-gu, Jyang-si, Nam-si pursuant to the direct margin No. 12 weeks of treatment, the Plaintiff suffered damage to the left-hand part of the instant accident, such as the right-hand part, the right-hand part, the inner part of the right-hand part and the outer side part, the right-hand part, the 2nd to the right-hand part and the left-hand part of the 7th to the left part, the left-hand part of the wook and the air e part.
C. At the time of the instant accident, the signal, etc. viewed by the Plaintiff (hereinafter “instant signal, etc.”) entered the same time as the left- and right-hand turn signal (if the instant signal, etc. works normally, the signal, etc. enters the same time as the left-hand turn signal). The signal, etc. viewed by the driver of the instant truck and the driver of the instant truck, who was inferred with the Plaintiff’s car, entered the right-hand signal.
[Ground of recognition] Facts without dispute, Gap evidence Nos. 1 and 2 (including branch numbers for those with additional numbers; hereinafter the same shall apply), Eul evidence Nos. 3, 4 and 7, and the purport of the whole pleadings
2. Occurrence of liability for damages;
(a) construction or management of public structures established in accordance with article 5(1) of the State Compensation Act;