logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 광주지방법원순천지원 2019.01.16 2017가단76941
부당이득금
Text

1. The Defendants are to the Plaintiff:

A. Attached Form

2. With respect to each amount entered in the sum column of the Optional Calculation Table and each amount above.

Reasons

1. Basic facts

A. The ownership status of each of the instant lands 1) M&M 216.8 square meters (hereinafter “instant land”) at the time of leisure water.

(2) On January 14, 1993, when the ownership transfer registration was completed with respect to 1/3 shares in the name of N,O, and P, the shares of N were transferred to Defendant B. On September 24, 1993, the shares of N transferred on September 24, 1993 to Defendant C. The shares of P were purchased through compulsory auction procedure by the Plaintiff and completed the registration of ownership transfer on October 17, 2005. 2) The shares of P Q & 216.8 square meters (hereinafter “the shares of this case”) were transferred on January 14, 1993 to Defendant B.

3) U large 245.4m2 (hereinafter “instant 3m2”).

) On January 14, 1993, V, P, and W, the ownership transfer registration for each of 1/3 shares was completed in the name of X on January 11, 1994; X shares were transferred toY on January 22, 2003; Y shares were transferred to Z on June 4, 1994; Z shares were transferred to Z on August 22, 2007; NA shares were transferred to 20.1.2 to NA on March 16, 1998; AAE shares were transferred to 20.2 to AE on February 19, 199; AB shares were transferred to 30.3; AE shares were transferred to 94.3 G on December 3, 2002; and CAI shares were transferred to 91.3 G on September 4, 1999; and DIE shares were transferred to 193.3 G on December 4, 2004.

B. The current status of the construction and ownership of the instant building 1) Buildings listed in the separate sheet on each of the instant land (hereinafter “instant building”).

On December 9, 1993, after the completion of the construction, the approval for use from the leisure market.

arrow