(영문) 의정부지방법원고양지원 2015.01.08 2014가단11270
손해배상
Text

1. The Defendant’s interest in KRW 13,900,000 to the Plaintiff (Appointed Party) and its interest in the year from August 13, 2012 to January 8, 2015.

Reasons

1. Facts of recognition;

A. The Plaintiff was awarded a successful bid of 103 Do 202 Do 103 and 202 on November 4, 2010 during a voluntary auction procedure, and paid the price in full, and completed the registration of ownership transfer with respect to the foregoing household on November 16, 2010, and entered into the said household and resided in the said household, and the Plaintiff’s designated parties C and D also moved into the said household.

B. The Defendant was awarded a successful bid of 103 Dora 103 302 Dora 202 Dora 103 202 Dora 103 Do 202, and paid the price in full on July 2, 2010, and completed the registration of ownership transfer with respect to the above generation on July 13, 2010.

C. The Plaintiff demanded that the Defendant, the owner of the instant loan No. 103 302 dong 103, 202, who was residing in the instant 103 dong 202, block water leakage and compensate the damage incurred to the Plaintiff’s house, on August 13, 2012, who did not comply therewith, sent a content-certified mail stating the above requirements to the Defendant.

On August 2013, the Plaintiff discovered water leakage with the boiler constructor within 103 302 Dara 103 302 at the request of F, the lessee of the instant Bara 103 302.

The constructor confirmed that the pipes should be replaced because water leakage is being made in the hot water pipe leading to the boiler from the boiler to the direction of the corridor.

E. The Defendant was delivered by the lessee under 103 302, 103 dong 302 with the confirmation of water leakage as above.

However, the defendant could not respond to the plaintiff's request because electric utility charges, repair costs, and rooftops, etc. are not liquidated when ordering the plaintiff and the plaintiff's plaintiff's plaintiff's lux G 101 201 No. 201.

On November 7, 2013, the Plaintiff is urged to repair water leakage.