logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 청주지방법원 충주지원 2015.04.17 2014고단598
업무상과실치사등
Text

A defendant shall be punished by imprisonment for six months.

However, the execution of the above punishment shall be suspended for one year from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

The Defendant is a site warden of the construction of rainwater treatment facilities, Co., Ltd. D (hereinafter referred to as “D”).

The Defendant is a person who has been supplied with a structure construction from F Co., Ltd. in the construction of D E plant non-point pollution reduction facilities (hereinafter “instant construction”) and has a duty to take safety and health measures to prevent industrial accidents of workers belonging to the instant construction work.

On October 17, 2014, the Defendant had the victim G perform the removal of water pumps on a concrete structure at the construction site of D rainwater treatment facilities around 09:40.

In a place where workers are at risk of falling, such as the end, etc. of the passage, the business owner neglected his/her duty of care to prevent the occurrence of danger, such as installation of a strong structure with sufficient strength, wearing a safety cap and a safety line, etc., and caused the victims to work without installing safety fences around the concrete structure where the victims work without installing safety fences, and by negligence without installing safety fences, and causing the victims to work for the removal of vae, he/she fell from a concrete structure with a height of 3 meters high from vadle, which is 13:05 on the same day, and did not take measures necessary to prevent the occurrence of danger at a place where workers might fall.

Summary of Evidence

1. Defendant's legal statement;

1. The police suspect interrogation protocol of H;

1. Each police statement to I, J, and K;

1. A death certificate, each photograph, and a written record of autopsy;

1. A written contract for construction works, a business registration certificate, a full certificate of registered matters, a report on measures to suspend work, a report on occurrence of serious accidents, and a written opinion of

1.A report;

arrow