(영문) 인천지방법원 2015.12.22 2015나7459
물품대금반환
Text

1. All appeals filed by the Defendant (Counterclaim Plaintiff) (including applications for the return of provisional payment) and counterclaim claims filed in the trial.

Reasons

1. Comprehensively taking account of the overall purport of arguments as to Gap's claim, Gap evidence Nos. 1 through 7, Eul evidence Nos. 1 through 3, evidence Nos. 5 through 9, and Nos. 11 through 13 (including each number), the plaintiff entered into a contract with the defendant on Oct. 20, 2014, which is 3 meters outside of 3 meters (the size is very difficult to accurately rout the size from the machinery processing) so it is better for the plaintiff to establish the maximum size and minimum size permitted by the structure to pass the contract between them. It means that the plaintiff would pass the contract. 【 0.1) 】 2m (the difference 【0.1) 】 100m in length 】 2,530m in length (including the price added) 】 20m in length from the date on which the order was issued to the plaintiff.

arrow