(영문) 서울중앙지방법원 2016.01.22 2014가합536795
구상금
Text

1. The Plaintiff:

A. Defendant A Co., Ltd, B, C, and D shall be jointly and severally 243,807,280 won and 130,116,800 won among them.

Reasons

1. Basic facts

A. The Plaintiff (hereinafter “Defendant A”) entered into a limited trading agreement and joint and several sureties 1)

B) Between the two, the three guaranty insurance limit trading agreements on the implementation, tax payment, authorization, permission, etc. (hereinafter “each limit trading agreement of this case”) around December 1, 2010, around December 9, 2011, and around December 24, 2012.

(2) Defendant B, C, and D respectively signed a guarantee insurance contract for the performance and guarantee of payment due to Defendant A’s construction work (hereinafter “the first or fifth insurance contract”) based on each of the instant limit trading agreements, based on which Defendant A would be liable to the Plaintiff at the time. (2) The Plaintiff concluded a guarantee insurance contract for the performance and guarantee of payment due to Defendant A’s construction work (hereinafter “the first or fifth insurance contract”).

C. From November 1, 2012 to November 30, 2013, the Korea Environmental Industry and Technology Institute 39,904,600 won to November 30, 2013, which was paid from November 1, 2012 to November 30, 2013 to November 30, 2013, the insurance period of the insured for each type of guarantee is KRW 131,68,00. The Korea Environmental Industry and Technology Institute 22,643,60 won to be paid from November 27, 2012 to September 25, 2014, the Korea Electric Industry and Technology Institute 22,643,60 won to be paid from November 27, 2012 to the Korea Electric Power Corporation 30,04 to September 25, 2014; and the Korea Electric Power Corporation 30,600 won to be paid from November 25, 2014 to Korea Electric Power Corporation.

The Plaintiff concluded an insurance contract between Samsung C, C, and D7 payment from September 15, 201 to June 30, 2014 and the Korea Environmental Industry and Technology Institute 39,904,600 to June 30, 2013 from July 1, 2009 to June 30, 2013; the Korea Environmental Industry and Technology Institute 22,643,600 to December 29 to December 30, 2013; and the Korea Environmental Industry and Technology Institute 22,643,600 to December 30, 209; and the Korea Electric Power Corporation 2,250,000 to December 30, 201, and the Korea Electric Power Corporation 30 to December 13, 201, respectively.

Defendant B and C shall be the 6.7.