Text
1. Defendant F, from the Plaintiff, Defendant F, the Plaintiff: (a) 21019 square meters of I forest land in Echeon-si; (b) 47890 square meters of J forest; and (c) 37018 square meters of K forest land, respectively.
Reasons
1. Basic facts
A. Plaintiff B is the actual operator of Plaintiff M Co., Ltd. (hereinafter “M”), Plaintiff A is the form of Plaintiff B, Plaintiff C and D, Plaintiff C and Plaintiff E are the shapes of Plaintiff B, and Plaintiff E are the parts of Plaintiff B.
B. On September 16, 2002, Nonparty N purchased each real estate listed in the separate sheet No. 1 (hereinafter “instant land”) through a voluntary auction procedure, and concluded a sales contract with Defendant F and H on January 10, 205, to sell the instant land to Defendant F and H, but to Defendant F, the shares of the land listed in the sequence No. 15/107415 among the instant land, the shares of 126.85/160 of the instant land listed in the sequence No. 2, the shares of 126.85/107415 of the instant land, and the shares of 1250.85/107415 of the instant land among the instant land, and the shares of 2250.85/107415 of the instant land, and the shares of 33.15/160 of the instant land listed in the sequence No. 2 among the instant land, respectively.
C. On March 14, 2005, when the term of the lease of the factory site expires while the plaintiffs operated M, the plaintiff F entered into a contract with the defendant F to purchase the purchase price of KRW 3,300 square meters ( approximately KRW 10,909,0908 square meters) in the attached Form No. 396,00,00 among the land in this case. As the special terms of the above contract, the following was agreed as the special terms of the above contract, and the defendant G, the actual owner of some of the land in this case and the husband of the defendant H, the husband of the defendant H, the joint and several surety performed the special terms of the defendant F.
Real estate: 3,300 square meters (32,541.41 square meters) of 107,575 square meters (32,541.41 square meters):
1. The civil engineering works shall be performed up to the road boundary line so as to make a factory available;
2. Basic works in packing works shall be conducted by an O company during the period;
3.The last package of the container shall be placed on the buyer.
4. Road or factory division shall run in consultation with a buyer;
5. He/she shall, upon receiving an application for permission from a seller, decide to change the name of the purchaser after obtaining such permission.
6. The Corporation shall complete the balance from May 15, 2005 to 100 days.