logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2017.06.02 2016노3941
업무상과실치상
Text

The judgment below

Part concerning Defendant B, C, and D among them shall be reversed.

Defendant

B B Imprisonment with prison labor for eight months and for three months.

Reasons

1. Summary of grounds for appeal;

A. In fact, Defendant B (misunderstanding of facts, misunderstanding of legal principles, and misunderstanding of legal principles, the cause of the collapse accident of this case is mixed with the term “system distribution” or “system sharing” in accordance with the expert opinion, etc. of this case by the first floor floor of this case. Thus, it is insufficient to unify the term “system distribution” with the term “system distribution,” and thus, the first floor was collapsed first. Thus, the issue of installing the first floor of this case is not included in the scope of supervision services, and thus, it cannot be viewed as Defendant B’s negligence.

(2) The sentence of the lower court (one hundred months of imprisonment without prison labor, two years of suspended execution) is too unreasonable.

B. Defendant C and I Co., Ltd. (misunderstanding of facts, misunderstanding of legal principles), and misunderstanding of legal principles ① The cause of the collapse accident of this case is that the provisional termination on the first floor of the roof concrete other than the concrete of the concrete of the apartment floor exceeds 3 to 4 times the load of the temporary installation and concrete, and that of the system so that the weight of the 1st floor is able to support, and that the 1st floor was collapsed first, and that of the 1st floor of the 1st floor of the 1st floor of the system so that the spath system spath has collapsed or damaged.

In order to prevent this, when installing jacks or Doba, which can support the first floor floor in the underground floor, this accident would not occur.

The responsibility of the collapse accident of this case is that if it is impossible to request a structural review to examine whether the floor of the first floor can reduce the load above the ground stated by the roof concrete with the concrete on the roof floor, the construction was carried out after installing jack knb or Dongba in the underground floor and strengthening it.

The contractor and supervision team are required to determine that the first floor floor is far more than 28 days from cement concrete growth period, and there is no problem, and Defendant I Co., Ltd. (hereinafter “I”) and Defendant C, the site manager, are the concrete of the roof of the floor.

arrow