Text
1. The Defendant’s KRW 149,481,855 as well as the Plaintiff’s annual rate of 5% from April 9, 2015 to May 18, 2016.
Reasons
1. Basic facts
A. The parties to the instant case and the order 1) The Plaintiff was organized as a regional forestry cooperative with the jurisdiction of the BC Si under the Forestry Cooperatives Act, and the private forest owners and forestry workers as its members. A regional forestry cooperative is operating a forest project under the Creation and Management of Forest Resources Act with the competent local government. 1) B was to implement the D project with a total of 1,050 hectares within the territory of B.
D Project is a project that has established a long-term policy in the Korea Forest Service and has been implemented since 2008, and includes work such as tree planting, green tree planting, felling, cutting down, cutting down, and preventing blight and harmful insects.
(2) D projects implemented in Category B shall be carried out in the following stages:
First of all, the Gun office shall select a designer, conduct on-site surveys on the target area of the project (project) in the design company, and submit the results of the survey on the standard land to the Gun office based on the field surveys.
The Gun office shall select a supervisor and then confirm whether the design is appropriate based on the above-mentioned data submitted by the designer.
The Gun Administration shall determine whether to approve a project based on the results of supervision, and shall select a contractor and conclude a construction contract upon approval of the project.
A construction business entity shall conduct work in a zone determined by design drawings, such as specifications, and a supervision business entity shall supervise whether construction works are appropriate.
3) On May 8, 2014, the Plaintiff entered into a construction contract with the content that D business with respect to forest land B and E is to be implemented from May 9, 2014 to December 4, 2014 (hereinafter “instant business”).
AB concluded the agreement.
The F of the Forest Professional Engineer Office F was a design firm in charge of the design of the project in this case, and G of the Forest Professional Engineer Office G was in charge of the supervision of the design and construction of the project in this case.
B. The instant accident occurred.