Text
The plaintiff's claim is dismissed.
Litigation costs shall be borne by the plaintiff.
Reasons
1. The contract date of Samsung 2,00,000 KRW 40,000, monthly rent of 110,000 for the 2-year contract period of January 23, 2018, and 1.10,000 KRW 20,000,000 for the 6-year contract period of Samsung 2,00,000 KRW 40,000,000 for the 6-year contract period of 2,000,00 KRW 50,000 for the 6-year contract period of 2,00,000,000 KRW 5,00 for the 60,000,00 KRW 7,000 for the 60,000,000 for the 6-year contract period of Samsung 2,50,000,000 KRW 7,00 for the 20,000,00 for the 6-year contract period of 2,04,01000.
A. The Plaintiff and the Defendant concluded a contract with the terms and conditions as follows while leasing a printer to the Defendant (hereinafter collectively referred to as “each of the instant contracts”). B. The Plaintiff appears to have concluded a contract with the Defendant on September 4, 2019 (as seen below 2-A) (i.e., September 6, 2019), which appears to be a contract with the Defendant on September 6, 2019.
Although the Defendant entered into the instant self-contract on September 6, 2019 (hereinafter “instant contract”) but failed to comply with it, the Defendant sent a certification to the effect that he/she will be held liable for civil and criminal liability if he/she did not comply with it (hereinafter “certification of the Plaintiff’s content”).
The defendant shall prove its content at that time.