(영문) 의정부지방법원 고양지원 2018.12.12 2016가단93399
건물등철거
Text

1. The Plaintiff:

A. Defendant B shall have the respective points indicated in attached Form 1, No. 24 through 27, and No. 24, respectively, on the ground of 2,145 square meters in Pakistan-si.

Reasons

1. Determination as to the cause of claim

A. The Plaintiff’s recognition 1) on February 13, 2003, the Plaintiff is deemed to be the Plaintiff’s land of this case, namely, E large 2,145 square meters (hereinafter “instant land”).

(2) As of the closing date of the instant argument, the Defendants’ building and vinyl are located on the ground of the instant land, and the specific location of the said building and vinyl is as follows. The Defendants occupy the relevant building and vinyl house.

1. Defendant B (hereinafter referred to as “instant building, etc.”) ① 24 through 27, and 24, each of the items listed in the annexed drawing Nos. 1 (hereinafter referred to as “instant building”) ① 26m20,000,000,000, connected in order to each of the items listed in the annexed drawing Nos. 1 28 through 33, and 28; ② 38m2,000,000,000,0000,0000,000,0000,000,000,000,000,000;

2. Defendant C (hereinafter referred to as “instant building, etc.”) ① The part “A” part of the instant building connected each point of the following subparagraphs 1 through 10, and 1 in order to connect each point of the annexed drawing Nos. 1 to 10, 100 square meters, which is part of “B” connected in order to each point of the annexed drawing Nos. 11 through 19, 11 in the annexed drawing Nos. 1, 60 square meters; the part “B” part of “B” part of the cement brick structure, brick structure, string roof one-story housing; and the part “A” part of “A” part of 10 square meters connected each point of the annexed drawing No. 20 through 23, and 20 square meters.

3. Defendant D (hereinafter referred to as “the instant third building, etc.”) ① 22m2 in the warehouse part of the warehouse connected each point of 38 to 41, and 38 indicated in the annexed Form 1 drawings ② 42m2 in order to connect each point of 42 through 47, and 42 in the annexed Form 1 drawings, Defendant D (hereinafter referred to as “the instant building, etc.”) ① 50m3,000,000,000,000 in order to connect each point of 89m3,000,000,000,000: