1. Of the judgment of the court of first instance, KRW 765,524 against the Plaintiff as to the Defendant and its related amount, from November 18, 2015 to November 3, 2017.
Reasons
1. Basic facts
1. The defendant's obligations;
A. In manufacturing the instant machinery, the Defendant shall pay the Plaintiff the manufacturing drawings and raw materials cost in cash.
B. The Plaintiff shall provide the data necessary for manufacturing the instant machinery.
2. Plaintiff’s obligations.
A. Manufacturing two parts of the instant machinery, and delivering them under an agreement with the Defendant until the test operation is conducted.
B. The instant machinery is to be supplied until May 15, 2015 after completion of trial operation.
C. On April 29, 2015, the Plaintiff and the Defendant confirmed each other from the instant machinery that was conducted until April 29, 2015, and the Defendant paid KRW 5 million for the manufacturing cost up to the test operation (hereinafter “production cost of this case”) to the Defendant and supply the manufacturing cost by May 15, 2015.
In manufacturing the instant machinery, a photograph or report shall be made in writing to the defendant on the manufactured matters.
3. Matters of the special agreement;
A. The design made of the instant machine and the technology based on each process shall require all security, and shall be civil and criminal liability in the event of providing it to a third party.
B. The plaintiff will complete the assembly by manufacturing Hoba, mixed, and didices.
Based on the drawings made by C, the Defendant is a machine that produces pelpellets (a compressed with trees and used as alternative fuel) by automatically entering pelpellets when pelpellets consisting of pelpellets machines and speltos and speltos, in a speltos.
(2) On April 29, 2015, the Plaintiff entered into the following business agreements (hereinafter “instant agreement”) with the Plaintiff while entrusting C with the manufacture of the instant machinery (hereinafter “instant machinery”).
B. The Defendant provided the Plaintiff with the mechanical drawings prepared by C pursuant to the instant agreement (hereinafter “the instant drawings”), and paid the Plaintiff KRW 3,00,000,000, total of the processing costs proposed by C, and KRW 8,000,000,000, total of the manufacturing costs of the instant case. The Plaintiff manufactured the instant machinery in accordance with the instant drawings.
C. The Plaintiff and the Defendant on May 2015.