(영문) 서울남부지방법원 2014.11.06 2013가단40104
공사대금 등
Text

1. The Defendant’s KRW 6,247,647 as well as the Plaintiff’s KRW 6% per annum from May 10, 2013 to November 6, 2014.

Reasons

1. Basic facts

A. The Plaintiff is a person who runs a construction and waterproof business with the trade name “C” and the Defendant is a corporation with business purposes, such as building design works and waterproof construction works.

B. On March 2013, the Defendant entered into a contract with the Plaintiff for construction works for the construction of the E-art building consisting of the first underground floor, fourth floor, and rooftop floor located in Seongbuk-gu, Seongbuk-gu, Sungnam-si, with the following contents (hereinafter “instant construction contract”).

(2) Payment of actual expenses, such as personnel expenses, material expenses, food expenses, etc. (the area of underground floor shall be considered as 1,664m2, and the price shall be calculated as 5,000m2 per 1m2) (i) the construction cost of the construction of the construction of the ground-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-land-to-

C. Until May 9, 2013, the Plaintiff performed the construction of underground water leakage and repair of the Eart building as well as the construction of underground floor liquid waterproofing construction and the ground-to-ground-to-land-to-land-to-land-to-land-to-land carbon construction.

(hereinafter referred to as "basement construction" in total with the construction of underground floor, and the construction of the ground floor shall be referred to as "the construction of underground floor", and the construction of the ground floor shall be referred to as "the ground for recognition") / [the ground for recognition] without dispute, Gap 3, Gap 6-1 through 4, part of witness F's testimony (excluding the part contrary to the above fact of recognition among witness F's testimony) and the purport of the whole pleadings.

2. Summary of the plaintiff's assertion

(a) Construction cost for underground floor construction: 29,295,361 won in total (1) labor cost, material cost, and food cost (18,312,146 won in total) 18,320,000 won in total determined at a certain price per area (3) labor cost, material cost, food cost, and above 8,320,00 won in total (10% in total) that are disbursed for underground floor construction; and