logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2018.12.06 2018나29923
구상금
Text

1. The judgment of the court of first instance is modified as follows.

The Defendant’s KRW 9,423,216 to the Plaintiff and its related costs on August 4, 2017.

Reasons

1. A claim for indemnity related to a traffic accident that occurred at the Sam-distance Intersection at the entrance of the Korea Highway Corporation, 196 at the time of Silung-dong, 196 at Silung-dong, 06:35 on February 10, 2012 (see attached Form and

2. The instant accident is an accident in which the front left part of the Defendant’s vehicle (B bus and the instant accident scene “Ma2”) located along one lane from the front left part of the two-lane road to the lower part of the front left part of the vehicle at the front left part of the vehicle’s boom at the front left part of the vehicle (referred to as “B bus” and the instant accident scene), and the Plaintiff’s vehicle was temporarily parked at the intersection and left part according to the left signal, but it is difficult to pass through the intersection due to the left part of the vehicle at the time of the said intersection, but it was not possible for the vehicle to go through the intersection at the left part without reaching the right part of the vehicle, and it was not possible for the Plaintiff to go straight or right part of the vehicle at the time of the said intersection, and it was not necessary to take measures to prevent any collision between the Plaintiff and the front part of the vehicle at the right part of the vehicle at the time of the instant accident.

arrow