1. The Defendant (Counterclaim Plaintiff) paid to the Plaintiff (Counterclaim Defendant) KRW 110,00,000 and the amount pertaining thereto from June 29, 2019.
Reasons
1. Basic facts
A. On November 30, 2018, the Plaintiff and the Defendant Company C entered into a contract with the Defendant Company to sell one bridge inspection unit to the Plaintiff at KRW 600,000,000 (hereinafter “instant contract”).
B. On December 4, 2018, the Plaintiff transferred KRW 200,000,00 to the account under the name of the Defendant Company.
(c)
On January 24, 2019, the Plaintiff sent to C a written notification demanding the return of KRW 200,000,000 as the instant contract was cancelled.
C: I will pay the money at the present moment, and will be good until the contract is entered into.
It is difficult to do so because there is a person who intends to do so.
I ambling fling: At present, I have a little time: C: so far as possible. The Gu's affairs are put in the Gu's affairs to the extent of KRW 100 million, and the remainder of KRW 100,000,000, which will be late at the same time. Do's affairs should also come into the objects, and have already been discarded.
There is no money. D: 100,000 won at any time. C: so doing. B. There is a problem that the money should be lent only if it is the E president and it is possible to hold the consultation.
As such, 100 million won is end of the Gu administration, and the remaining 100 million won is waiting for. The end of 6 months as of the end of 100,000,000. If the contract is concluded, there is sufficient time until the contract is ended.
required.
So far, it is essential for the us to do so within the territory of the host city until then.
We need to see the president and consultation with the E president, and the problem is that it is difficult to think that it is a single one, because we need to make a prior entry of funds.
Overseas shall not be able to pay a down payment without paying it. It is impossible to do so at least 30% of the internal prices.
(g) Failure to shoulder the dead;
(g)to produce internal prices, if different;
D) The contract of foreign country is not able to obtain water, and how to ask 30% of the internal price, and how to inquire about the case, and the case is c: internal price.