logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원김천지원 2014.04.09 2012가단2350
손해배상(기)
Text

1. The Defendant’s KRW 19,078,00 for the Plaintiff and 5% per annum from December 29, 201 to April 9, 2014.

Reasons

1. Facts of recognition;

A. The Defendant, with the trade name of “B”, is the owner of registration number C (TM 1200 tons, size: 200 tons, annual formula: 195; hereinafter “instant aircraft”) who engages in the business of leasing construction machinery, such as machinery during the season (hereinafter “B”), and the Plaintiff is a company which subcontracted the removal of the construction of the instant factory building and equipment on the ground (hereinafter “the instant removal construction”).

B. On November 24, 201, the Defendant leased the instant weighter to the Plaintiff at KRW 3.5 million (hereinafter “instant lease agreement”), including E, a driver, etc., of the instant weighter, and the content that E is to be carried out by using the instant weighter was that, among the instant factory buildings, the steel structure separated from one wall for raw material consent, cut approximately 18 tons of a steel structure separated from one wall (hereinafter “the instant steel structure”) and then cut to the bottom (hereinafter “the instant work”).

C. At around 10:10 on November 24, 201, E operated the instant weighter at the site of the removal project, and moved the instant steel structure to the left-hand side for moving the steel structure to a place located adjacent to 180∑ 180∑. When the instant steel structure was transferred to a place located adjacent to the removal project, there was an accident that cut off the connecting parts between the two parts and the three parts among the boom boom boom boom boom boom boom boom boom boom boom boom 201 (hereinafter “instant accident”).

Around 16 meters of the Working Group at the time of the instant accident and approximately 54.5 meters of the length of boom boom boom boom boom boom boom boom boom booms at the time of the instant accident, in such a case, the adequate weight according to safety standards (85% of the maximum boom boom 2.4 tons of the total boom boom boom booms

E. After the accident of this case, the Defendant cut off as above to the scene of the removal work of this case.

arrow