(영문) 서울중앙지방법원 2016.07.20 2015가단5366908
구상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Facts of recognition;

A. On February 21, 2014, the Plaintiff entered into an insurance contract with Suwon-si, Suwon-si, the owner of Suwon-si, Suwon-si, the 18 Suwon-si, the owner of Suwon-si (hereinafter referred to as the “building in this case”) and the insured, setting the period of insurance from February 21, 2014 to February 21, 2015.

The above insurance contract includes a security for liability of the facility owner manager, and in the case of the above security, the insured amount per accident was set at one billion won.

B. On December 31, 2013, the Defendant entered into a facility management contract with the Suwon Dogyeong Station and the contract period from January 1, 2014 to December 31, 2014, and managed the part of the instant building used as the AK ZA datum and renewed each year.

Details related to the contract shall be as follows:

Article 3 (Contents of Work) A (C) entrusts B (Defendant) with the following duties, and B shall prepare a plan for performing the contracted work by itself, and assign B human resources to perform the contracted work:

The scope of the subject of management of B under this Agreement shall be the datum of AK PEA.

1. Operation, maintenance, repair and management of electrical equipment, heating and cooling equipment, cooperative equipment, water supply and drainage equipment, sanitary equipment, disaster prevention and fire prevention equipment, broadcasting equipment, septic tanks, and other facilities attached to buildings;

2. Assistance in the construction, repair and management of facilities, such as ordering, contracting, completion, and acquisition related to the construction, repair and management, and safety management (1) Assistance in the repair and maintenance of facilities and the maintenance and repair of facilities.

1.In the implementation of this Agreement, Eul shall observe the relevant laws and regulations in accordance with the scope of the contract work of Gap and shall establish a plan for its own work process.

2. Eul shall have qualified persons perform its duties and shall be necessary for performing its duties;