(영문) 서울동부지방법원 2016.01.14 2015가단107077
대여금
Text

1. The Defendants are jointly and severally liable to the Plaintiff for KRW 90,000,000 and KRW 50,000 among them, from October 23, 2013 to 30,000.

Reasons

1. Determination as to the cause of the claim: (a) on August 20, 2013, Defendant A Co., Ltd. 2 to B; (b) on May 12, 2014 to B; (c) on October 23, 2013, the above Defendant A was changed to A; (d) on November 3, 200, KRW 30 million; and (e) on November 3, 2013, KRW 90,000; and (e) on November 25, 2013, KRW 200,000,000 (hereinafter “the instant loan”), KRW 30,000,000,000 per annum 2,000 per annum from the date following the date when the loan was extended to KRW 2,50,000,000,000 to KRW 30,000,000 per annum 1,500,000,000 won per annum from the date when the loan was closed.

2. Judgment on the argument of the defendant company

A. As to this, the Defendant Company denied the loan and affixed a seal on each one of the certificates Nos. 2, 3, and 4.

arrow