(영문) 수원지방법원 2018.08.08 2016가합75377
물품대금
Text

1. As to KRW 261,184,00 and KRW 192,038,00 among the Plaintiff, the Defendant shall pay to the Plaintiff KRW 69,146,00 from August 1, 2015.

Reasons

1. Basic facts

A. The parties concerned are companies that have developed NCUF-4015 (hereinafter “instant product”) “NCUF-4015 (hereinafter “NCUF-4015”) as companies that engage in the development, manufacture, processing, sale, export, and import, etc. of electromagnetic shielding and absorption materials. The Defendant supplied the instant product from the Plaintiff to the company with the development and processing, manufacture, and sales business of electromagnetic shielding and absorption products, and supplied it to the non-party corporation Han-kkn (hereinafter “NF-405”) and the Ilkk Co., Ltd. (hereinafter “NG”).

The instant product was installed on a G4 cell phone developed by Nonparty LG Electronic Co., Ltd. (hereinafter “LG electronic”) via an intermediate assembly company after undergoing a certain processing in the Hankkra and Manknovak. (hereinafter “the instant product”).

B. The Plaintiff agreed to supply the instant product to the Defendant on April 10, 2015, while entering into a contract with the original Defendant and the supply of the instant product, etc. (hereinafter “instant contract”) between the Defendant and the Defendant on April 10, 2015.

The contract of this case was concluded. The main contents pertaining to the quality of the product of this case are as follows. The Defendant A, a water supply quantity guarantee contract (hereinafter “A”).

) both the Plaintiff and the Plaintiff (hereinafter referred to as “B”).

section 8 (Control of Change)(1)(the product of this case refers to the product of this case),

hereinafter the same shall apply.

) The specifications of the Company A shall be the same as the specifications and drawings agreed upon between Company A and B, and in the event of any significant changes, such as any changes in process affecting the quality of products, such as product reliability, lifespan, compatibility, packing specifications, and specifications, any changes in the enterprise, any changes in parts, any changes in equipment and any changes in the place of production, etc., they shall be notified without delay to Company B. Article 10 (Disposal of Disqualified Goods ① Subject to the standards agreed with Company A and B.