(영문) 춘천지방법원 2018.10.17 2017가합50044
손해배상(산)
Text

1. The Defendants jointly share KRW 88,835,101 to Plaintiff A, and KRW 5,00,000 to Plaintiff B, respectively, and KRW 1,500 to Plaintiff C, D, and H.

Reasons

1. The status and fall of the parties concerned;

A. Defendant G is an employee of Defendant F Co., Ltd. (hereinafter “Defendant Company”).

Plaintiff

A operated the business of collecting recyclables in the name of "J" from Chuncheon City I.S.

B. On December 31, 2012, Defendant G was engaged in the process of collecting a large boiler tank that was on the container with K2.5 tons a vehicle at K2.5 tons at the place of business at the “J”, and Defendant G was engaged in the process of collecting a large boiler tank, the part of the steel plate of the boiler tank, which was on the container, made the Plaintiff’s chest on the container fall under the bottom of the container, and caused the Plaintiff A to suffer from an external fluorial ples, etc. with an open top in the chest.

(hereinafter referred to as “instant accident”). C.

Plaintiff

B is the wife of Plaintiff A, and Plaintiff C, D, and E are children of Plaintiff A.

【Fact-finding without a dispute over the basis of recognition, Gap evidence 2, 3, 25, 30 (including each number; hereinafter the same shall apply), the purport of the whole pleadings

2. Occurrence of liability for damages;

A. 1) The background leading up to the occurrence of an accident is that the Defendant Company operates the business of processing scrap metal, dismantling the rains, and dismantling the structures. From around 2008, Defendant G had been in charge of driving and coordinating the string vehicles while working in the Defendant Company, and collecting and transporting high water. 2) The boiler tank that the Defendant G attempted to collect at the time of the instant accident was on the container of 9 meters in width, 9 meters in length, 3 meters in height, 2.7 meters in height, and on the floor, the board was attached, and the 10 sandd position panel was on the string of this string.

Defendant G did not remove sand site panels in advance and carried out the collection work.

At that time, there were many loaded materials around the container, so it was impossible to set up even the vehicle.

Defendant G tried to gather boiler tanks in such a situation by booming boom booms of a boom vehicle to the maximum extent, but it was difficult to accurately fix the boom.

. Boiler tank .