logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2017.06.23 2016가합78338
정산금 청구의 소
Text

1. The Defendant’s KRW 2,500,000 among the Plaintiff and KRW 180,000,000 among them, shall be KRW 2,320,000 from November 5, 2013, and KRW 2,320,00,000.

Reasons

1. Basic facts

A. The Plaintiff is a corporation established under the Framework Act on Railroad Industry Development and the Korea Rail Network Authority Act to construct and manage railroad facilities, including steel routes, and to carry out related projects. The Plaintiff is a corporation established to operate the electric utility business in accordance with the Korea Electric Power Corporation Act.

B. The Plaintiff, along with other iron lines, manages the water line linking the water source and Incheon (the installation in 1937). From 195, the Plaintiff planned and implemented the business of expanding the water line from the water line to the double line (hereinafter “instant business”).

C. The Defendant set up on the answer 1222-6 of the Pari-ri-ri-ri-ri-ri and the answer 244-2 of the same Ri, each of the above transmission towers (hereinafter “the transmission line of this case”). The transmission line of this case crosses over the water line (345kV No. 47-48, 13 km).

In order to carry out the instant business, the Plaintiff was required to set up the instant power transmission line and raise the height of the power transmission line at the Defendant’s expense, and the Defendant rejected this request, but there was a dispute between the Plaintiff and the Defendant regarding the burden of expenses incurred in the relocation of the power transmission line.

E. On January 14, 2015, the Plaintiff and the Defendant entered into an agreement with respect to the burden of the relocation cost of the electric transmission line (hereinafter “instant agreement”).

Article 1(Purpose of this Convention) The purpose of this Convention is to set forth the subject(s) of the construction between "A" and "B" in relation to the removal and removal of obstacles in relation to the 3rd sections of handympis, construction costs, the main body of construction costs, the main body of cost burden, and the method of payment, etc.

Article 4 (Bearing of Construction Costs) The following total construction costs required for this project shall be borne by "A" in preference, and future litigations, etc.

arrow