(영문) 수원지방법원 2017.05.17 2016가단541860
구상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff is an insurer who entered into an automobile comprehensive insurance contract with C veterans belonging to B (hereinafter in this case), with the Plaintiff as the insured, and Cheonghtech Co., Ltd. (hereinafter in this case Cheonghtech) is a company that leased and used the instant crane from A and branch companies, while performing the construction and operation of wastewater treatment facilities among D construction work performed by E X-P Heavy Industries Co., Ltd. (hereinafter in this case Cheonghtech) under a subcontract. The Defendant is an insurer who entered into an insurance contract with Cheonghtech Co., Ltd., and E is a driver of the instant tea.

B. At around 14:10 on October 3, 2014, E driven the instant tea and moved the steel manufacturing tank equivalent to approximately 3.5t from the site of the removal of the sewage disposal facilities in the D Electric Power Plant located in the F of the East Sea at the time of the construction site of the East Sea, to load the said cler, while properly manipulating the length of the boom boom and the boom boom and the angle between the above coom and the ground, so that the weight of the cler does not exceed the cler’s specifications, due to the weight of the cler, safe operation of the cler so that the cler does not lose the weight of the clers to prevent the accident from getting off, while there was a duty of occupational duty to prevent the accident from being flowed to prevent the accident, it was easy to remove the cler from the water tank to the vicinity of the cler to the upper level of the cler to the upper level of the cler to the level of smooth.

This negligence led to the wind of the steel manufacturing tank to the public due to the separation of the wind at the time of the work.

As a result, the wind that the water tank falls down to the water tank where G workers belonging to the Cheonghotech, who have been able to perform the weighting work in the vicinity of the water tank, was able to fall off.

arrow