(영문) 서울중앙지방법원 2021.01.22 2018가합577343
보증금 등 청구
Text

The plaintiff's claim against the defendants is dismissed.

Costs of litigation shall include the parts resulting from the participation in the assistance.

Reasons

1. Basic facts

A. The Plaintiff of the parties, etc. is a corporation established for the purpose of marine transportation business.

Defendant D Co., Ltd. (hereinafter referred to as “Defendant D”) is a corporation established for the purpose of building, remodeling, selling ships, etc.

Defendant E Co., Ltd. (hereinafter referred to as “Defendant E”) is a corporation established for the purpose of commercializing Korean-type liquid natural gas (Lifued NNG), with a patent right for G technology.

Defendant E’s Intervenor (hereinafter “ Intervenor”) is Article 2 of the Korea Gas Corporation Act established under the Korea Gas Corporation Act for the purpose of promoting convenience in people’s lives and contributing to improving public welfare by laying the foundation for the long-term stable supply of gas.

B. The Intervenor, in cooperation with H (I and J Co., Ltd.) including Defendant D, performed a general task and joint research of “K” and “L” from September 2004 to September 2014. The F technology was developed through this process.

Around August 2014, an intervenor implemented a competitive bidding procedure for the operation of six shipping lines (group A2, Group B4) for the purpose of securing the stable transportation of LNG imported from M (G), etc., a corporation located in the United States (supply), etc. (hereinafter “instant LNG exclusive shipping business”). The Plaintiff participated with Defendant D in the bidding procedure for the instant LNG exclusive shipping business, along with the result, the Plaintiff was selected as the operator of two ships (group A) to be introduced and constructed by the Intervenor around October 2014.

(c)

On November 14, 2014, the Plaintiff entered into a contract for shipbuilding and input with a participant.

The Plaintiff established N andO (hereinafter referred to as “N”) as a Pakistan corporation.

Preferred to inception is around January 22, 2015.