(영문) 대전지방법원 2016.10.28 2016나100773
손해배상(기)
Text

1. Of the judgment of the court of first instance, the part against the plaintiff corresponding to the money ordered to be paid below shall be revoked.

Reasons

Facts of recognition

The plaintiff is the owner and resident of 105, 402, 105, 105, 402, and 102, and the defendant was the tenant of 105, 502, and 502, 105, 502, the upper floor (hereinafter referred to as "multi-family 502").

In December 2014, 2014, the water was diminished in the 402 river basin of the riverhouse, and after December 2, 2014, ice and fungi were generated in the ice tent in the living room. On April 2, 2015, the water was lowered from the river basin in the early October 2, 2015, and the water was lowered in the toilet basin around October 2, 2015, and even thereafter, the water leakage was maintained by December 2, 2015.

(hereinafter “instant water leakage”). On April 23, 2015, the Plaintiff sent a document verifying that “When the water leakage occurred, the Plaintiff would inevitably be able to file a lawsuit against the owner and lessee for damages, the Plaintiff would be able to inform the Defendant and take appropriate measures.” On April 23, 2015, the Plaintiff also sent a document verifying that “If the Plaintiff requested complete construction on the water source by April 30, 2015, the lessor, and the Defendant, the lessor, would be able to request complete construction on the water source by April 30, 2015.”

On February 2, 2015, about water leakage in apartment 502, piping rupture inspection, boiler leakage inspection, water leakage detection devices to put pressure into pipes, waterproof toilet waterproof construction, water resistance construction in the kitchen sewage hole, floor waterproof construction, and water leakage construction were not found and water leakage continued.

In April 2015, 2015, the construction works related to water leakage in apartment 502 (the construction works are not verified accurately), but the water leakage continued until December 2015, 2015, even though the construction works related to water leakage were not verified accurately.

After the Defendant had been on December 2015, D, on the floor of apartment Nos. 502, 100 or more, d, d, d, d, d, d, d, d, d, d, d, d, and d, d, d, the kitchen tank, and the kitchen pipe.