logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2014.01.21 2013가합1337
공사대금등
Text

1. As to the Plaintiff KRW 322,283,242 and KRW 20 million among them, the Defendant shall be from January 26, 2012, and KRW 14.5 million.

Reasons

(b)the main contents of the construction contract made at that time are:

Details of the Corporation

1. Construction name: New construction works of neighborhood living facilities;

2. Location of construction: Yeongdeungpo-gu, Suwon-si C;

3. 1) The building content is based on the drawings that have been modified first in September 2011, and parts of which are constructed in accordance with the additional drawings; 2) the building is constructed in accordance with the additional drawings; (1) the first underground floor, the second underground floor (water tanks, water pumps, etc.) (2) the 11th ground floor (including houses);

4. The construction amount: The construction amount in general shall be the one in general; and

(A) After the contract for electrical construction, the owner of the building shall determine the amount of the construction and the owner of the building. The amount of 1,540,00,000 won shall be the amount of the total construction cost which is non-payment at the time of the payment, and the amount of 1,540,00,000 won shall be the amount of the contract 10,000,000,000,000 won, and the amount of the contract shall be 1,540,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,00,000,00,000,00.

Therefore, it would be necessary to increase or decrease to the extent that the changed amount was changed from the total amount of four (32,360,000 won) per current pumps price (8,090,000 won) at the time of change.

(F) The amount of change shall be based on the estimate received by the owner; 5. The total period of construction and the date of completion: September (the date of payment of contract) - August (the date of payment of contract) - August 2012, Article 8 (Scope of Contract).

2. Where there is any change or error in the part requested by the project owner under Article 9 (Adjustment of the Contract Price due to Modification of Design), such as an entrance construction (Korean electric power plant, water supply system, wire cable construction, LN, telephone, etc.), fence construction, sewerage, hazard prevention plan, and stability management plan, the contractor shall do so;

arrow