Text
A defendant shall be punished by imprisonment for not less than eight months.
However, the execution of the above punishment shall be suspended for two years from the date this judgment becomes final and conclusive.
Reasons
Punishment of the crime
The defendant is a business owner who had been awarded a contract for construction of D detached Housing for KRW 450 million from E to a person who engages in personal construction business without business registration while living in Scheon-si C, and is a safety and health management manager for workers belonging to the above construction site.
1. Violation of the Occupational Safety and Health Act and occupational injury, death, etc. caused by occupational negligence have a duty of care to pay safety belts and safety caps to be worn by workers, and to take necessary measures for the prevention of fall, such as having workers wear safety belts, if it is difficult for workers to install a safety watch net at a place where workers might fall down, or to install a safety watch net;
Nevertheless, on August 17, 2013, the Defendant had the victim F, an employee of the above construction site, engage in the maintenance of boundary stones at the edge of a river with a height of approximately 2.7 meters, without paying a safety mother and a safety belt at the above construction site, and had the victim F, an employee of the above construction site perform the maintenance of boundary stones at the edge of a river with a height of approximately 2.7 meters, and the victim lost the center of body vadi, falling into a river, falling into a river, and died at the head above the river located at the river, and died of the fluoral brain from the fluoral dysium at the government-based 05:50 on the 18th day of the same month.
In this respect, the defendant neglected to take necessary measures to prevent the danger of workers, but caused the death of the victim due to occupational negligence.
2. Where the defendants in violation of the Occupational Safety and Health Act assemble a fluorium, they shall examine the structure thereof, prepare an assembly plan after and assemble it according to such assembly plan;
Nevertheless, on August 20, 2013, the Defendant did not prepare assembly drawings at the construction site at the same time and did so.