logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 2018.02.22 2017고단4743
배임수재
Text

1. Defendant A shall be punished by imprisonment for two years.

Seized evidence No. 4 shall be forfeited from the defendant A.

Reasons

Punishment of the crime

【Status of the Defendants】 Defendant A is the person in charge of the design room of the “T” military unit in us located, Defendant B is the person in charge of the design room of the same military unit, Defendant C is the person in charge of the same military unit planning and operation room, Defendant D is the person in charge of the electricity belonging to the same military unit, Defendant E is the person in charge of the military service of the usfk located in the same military unit, Defendant E is the person in charge of the military service of the usfk located in Daegu-gu U.S. U.S. U.S. located in the same military unit. Defendant F is the representative of the V U.S. U.S. located in Gangseo-gu Seoul Metropolitan Government, Defendant G is the person in charge of the headquarters of the X located in 1307, Defendant H is the person in charge of the Z located in the Z located in Gyeongdong-gu,

In AA region, the AB’s “AC”, “T,” “AD”, and “AE materials”, “AG materials”, are stationed in the US Army Armed Forces located in the said territory. In the US Army Armed Forces working for Defendant A, B, C, D, and E, the AI materials are entering into and executing contracts, such as construction, maintenance, repair, etc. of various facilities within the US Armed Forces unit, including the said main unit.

[Criminal Facts]

1. The receipt of property in breach of trust and the receipt of property in breach of trust in X-related corporation;

A. Defendant A, B, and B’s joint crime of breach of trust committed by Defendant A, and B had the authority to approve materials and modify designs while working in the design room belonging to the U.S. Armed Forces, and the construction work amount may be increased by 30% of the total construction cost through a design change during the construction work, and offered convenience to Defendant G, etc., who is the construction business operator, to receive money and valuables and entertainment from Defendant G, etc., and to designate the minimum successful bid price, the increase in construction cost through a design change, the increase in construction cost through a construction change, the provision of information on the construction tender conducted by the U.S. military unit in Korea,

Defendants are located in Daegu-gu AK on March 201, 201.

arrow