Text
1. The part against the plaintiff falling under the following order of payment among the judgment of the court of first instance shall be revoked:
The defendant.
Reasons
. 6,000,000 19,570,000
(b) Fact of recognition;
6. Details of services;
(a) Towing operations (in the first place of human resources: On four occasions a year, on three occasions a year, or on three occasions a year, or on sidewalk block: Continuing over the year);
(b) To ensure that the project is in the shape of military service and is in the shape of military service, by removing scamblings and seals by scambling and removing scamblings, cells of the bells, pipes, and scamblings (at the same time) and scamblings (at the same time, twice a year, twice a year, and twice a year);
(c) Precautionary measures against the blight and harmful insects (not less than eight times a year / from time to time when the disease and insect pests have occurred) (1) It shall accurately grasp the characteristics and ecology of trees and conduct timely and adequate diagnosis to assist the healthy growth of trees.
(2) The disinfection of pine trees shall be conducted four times a year, and railss shall, in principle, be performed every time of eradication.
(e) Fluorine expenses. (e) Heat trees and ornamental tree expenses. (2) Heat with heavy and strong trees, with no studs and shots of heat, and the leafs shall be dried up;
(Scened fertilizers (strus) * Gosib (strus) : 20kg x 300 g x 300 g x 20kg x 300 g x 300 g.
(g) Management of advanced mountain water;
(h) A water-flowing work (ever in progress) (1) When droughts continue to exist, water shall be given frequently to raise the vitality of trees and the flowers of ornamental trees shall be old;
1) Specifications attached to the instant contract (hereinafter “the instant specifications”)
The contents of the order guidelines for landscaping management (hereinafter referred to as the “instant order guidelines”) prepared by the Plaintiff are as follows: “4 times per annum for human resources, at least eight times per annum for the prevention of blight and harmful insects (refection), four times per annum for work of crest, three times per annum for creg, three times per annum for creg, three times per annum for creg, three times per annum for creg, three hundred creg (20km), three hundred creg per annum for creg (preg) and three hundred creg per annum for creg (for example), three hundred creg per annum for creg (20 kmg for creg), and the annual
3) A written estimate prepared by the Plaintiff on February 25, 2012 (hereinafter referred to as the “written estimate”).
(a)(b)(h)(d) costs for the first operation of 12,800,000,000.