(영문) 대구지방법원 서부지원 2018.10.10 2018가단51147
손해배상(산)
Text

1. The Defendants’ respective Plaintiff KRW 76,945,528 as well as 5% per annum from September 21, 2016 to October 10, 2018.

Reasons

1. Basic facts

A. The Defendant Central Construction Co., Ltd. (hereinafter “Defendant Central Construction”) and the Defendant Draft Construction Co., Ltd. (hereinafter “Defendant Draft”) contracted from the Korea Rural Community Corporation’s Joint Branch to the Defendant B Co., Ltd. (hereinafter “Defendant Draft”) the part of the construction work filled up the reservoir of the reservoir during the instant construction work under a joint contract with the “F Corporation” (hereinafter “instant construction work”) and the part of the reinforced concrete construction work to make the water flow out of the reservoir into farmland to the Defendant B Co., Ltd. (hereinafter “Defendant B”).

B. Around September 20, 2016, Defendant C, as an employee of Defendant B (technical director), was designated as a site manager and a safety and health manager of the soil works and the parts of reinforced concrete construction among the instant construction subcontracted by Defendant B at the construction site of this case.

Defendant D, as an employee of Defendant Central Construction (Deputy General) around September 20, 2016, was designated as a site manager and a person in general charge of safety and health as well as a site manager of the instant construction at the construction site of this case.

C. Around September 20, 2016, as employees of Defendant B (hereinafter referred to as “the network”), Defendant C, D, or H, a chief of the site at the instant construction site, took charge of the work of having daily workers work in accordance with the direction of the H, who is the Defendant C, D, or Defendant Central Construction Staff (chief). At around 13:47, due to the cost incurred by Defendant C’s work, he/she was reduced to the electric current generated from underwater pumps and died in the instant construction site while he/she took over the water from underwater pumps at the instant construction site.

(hereinafter referred to as the “instant accident”). At the time of the instant accident, Defendant C, as a person in charge of safety and health management at the construction site of this case, uses electric appliances at a damp place with high divers such as water, etc.