Text
Defendant
B A person shall be punished by imprisonment for a year and six months.
Defendant
A is not guilty. The summary of the judgment against Defendant A is publicly notified.
Reasons
Punishment of the crime
Defendant
B On August 16, 2013, the Gwangju District Court sentenced ten months of imprisonment for fraud, etc. at the Gwangju District Court on August 20, 2013, which became final and conclusive on August 20, 2013.
Defendant
B as a registered entity of the Korea hydroelectric Energy Co., Ltd. (hereinafter referred to as “Korea Institute”), B operated I (I (hereinafter referred to as “I”) as a Korean agent of the U.S. H (hereinafter referred to as “H”) at the manufacturing company of measuring instruments, such as RTD (Rsist Tratur, low temperature measuring instrument).
On July 29, 2008, Hanwon concluded a contract for the supply of goods (contract number O) by setting the contract amount of the 6,202,93,000 won (final 6,604,194,527 won) for the safety grade (ACU, Airleling Unit) and the virtue heating unit (EDH, Electriuuuuuuuut Heit) (N; hereinafter referred to as “facilities of this case”) to be installed in the L Headquarters M located in K located in J and Busan, Busan, and the delivery period from October 15, 2009 to July 31, 201. From September 29, 2009, J concluded a contract for the supply of goods (contract number 40,194,194,527 won) to the price of the goods to be supplied as the 19,2019,201,410 and 19,2014,09.
According to the purchase specifications (purchase specifications) of a contract for the supply of goods, which are parts of safety grade. A supplier may, prior to the supply of goods, obtain the verification of equipment (on-site verification, harsh conditions, and environmental verification within the terms and conditions) required by the purchase specifications, obtain the verification of equipment from the Korea Electric Technology Co., Ltd. and obtain the verification of quality from the Korea Electric Technology Co., Ltd. and obtain the verification of equipment (E Q, EquationU. 1), such as quality assurance, which can prove that they are parts of safety grade, from the H, and submit it to the Kou and Hanwon Water Quality Inspection Team, which is the shipping inspector, to deliver it through the shipment approval and acceptance inspection.
Defendant
B The bill of indictment was written on February 2, 2010, but this is written on February 2, 2010.