(영문) 수원지방법원 2017.10.13 2015가단136568
용역대금
Text

1. The Defendant’s KRW 57,506,00 for the Plaintiff and KRW 5% per annum from August 4, 2015 to October 13, 2017.

Reasons

1. Facts of recognition;

A. On June 7, 2011, the Plaintiff owned the land B on behalf of the Defendant, and the land C and D (hereinafter referred to as “land”) on the basis of the name and the lot number of the Plaintiff and the E Co., Ltd., and the land D is jointly owned by the Defendant.

A contract for designing and supervising construction of urban-type residential housing (hereinafter referred to as “instant contract”) was concluded, and the details thereof are as follows:

Design 1) Site Area: 4,497.00 square meters: The total floor area of urban-type residential housing (multi-household housing 3): 3,890 square meters: 4,000 square meters (1,177 square meters inside and outside) contract amount: 3,890 square meters (1,177 square meters): 90 square meters in daily gold-gu 94,000,000 per VAT 20% in the contract amount of payment rate of 18,80,000, 30% in the permission amount of 37,60,000, 30% in the land at 30% in the commencement of construction: 30,20,000, 400, 300, 300, 400, 400, 400, 94,000, 100, 400, 400, 30, 40, 40, 000, 4, 6,20,

d) On August 12, 2011, the Plaintiff: (a) prepared a design drawing (a) and applied for a construction permit or an amendment to the permitted matters concerning the instant construction project; and (b) filed an application with the head of the Gu for a construction permit or an amendment to the permitted matters with respect to C Corporation (hereinafter “instant company”).

(A) A building permit (permission No. H) granted to the owner as the owner, and on August 17, 201 with respect to D works, the owner of the building permit (the name of the owner of the permitted number J) granted as the owner on August 17, 201.