(영문) 서울중앙지방법원 2018.11.28 2018가단5131790
구상금
Text

1. The plaintiff's claims against the defendants are all dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

Basic Facts

당사자 원고는 토목건축공사업 등을 주된 영업으로 하는 회사로서, D-E간 복선전철 중 시흥시 F에 있는 G 도로 인근 등지에서 진행되는 제2공구(이하 ‘이 사건 현장’이라고 한다)에 있어서 H 주식회사로부터 지하터널공사 등을 하도급받아 이를 시공하였다.

Defendant B, who is engaged in the business of transporting and loading construction materials by driving cars, was employed by the Plaintiff Company as a daily employee from January 2014 to January 2016, and was in charge of the business of unloading and piling construction materials at the instant site. Defendant C Co., Ltd (hereinafter “Defendant Insurance Company”) is an insurance company that entered into a business liability insurance contract with Defendant B.

I from November 2014 to October 2015, and from December 2014 to October 2015, J concluded a daily/temporary employment contract with each Plaintiff Company with each Plaintiff Company and ordered Defendant B to work as a household facility worker at the instant site.

The network K (hereinafter referred to as “the network”) was engaged in cargo transport business from October 2014 to January 2015 using 3.5 tons of cargo vehicles owned by itself.

L Co., Ltd. (hereinafter referred to as “L”) was dispatched to the site of this case M, who is an employee, as a business entity providing design advice related to the instant construction work to the Plaintiff.

The accident of this case and M, a worker of the deceased, asked I and J, who is an employee of the plaintiff, to temporarily load the steel products to be used at another construction site at the site of this case. The I and J consented to this and ordered B, a driver of the plaintiff, to load and unload the steel products being loaded by L to the deceased, etc., and served as a signal number at the loading and unloading work site.

around 15:00 on January 15, 2015, the Deceased’s Synthetic Team Assistant Steel around 3.5 tons at its own 3.5 tons.

arrow