(영문) 인천지방법원 2018.06.27 2017가단28817
손해배상(기)
Text

1. The Defendant’s KRW 18,282,560 for the Plaintiff and 5% per annum from April 24, 2018 to June 27, 2018.

Reasons

1. Occurrence of liability for damages;

A. On November 10, 2016, the Plaintiff: (a) from the Defendant on November 10, 2016, the entire Seo-gu Incheon, Seo-gu and D basement 448.76 square meters (hereinafter “instant building”).

(2) On January 2017, the Plaintiff and the Defendant visited the site and directly examined the site, reduced the rent from KRW 900,000 to KRW 600,00 on January 20, 2017, to KRW 900,000, and to KRW 600,000 on November 20, 2018.

3) On July 2017, at the same time, around the wall where the septic tank of the front exhibition room of the instant building is located and the opposite part of the wall where water was accumulated, making it impossible to sell a part of the household in the water. 4) The Defendant requested the management company to inspect the instant building on February 14, 2018, and the F in charge of the management of the building prepared the inspection report, and the main contents of which are as follows.

Details of underground room inspection;

1. The state of septic tanks / the state of septic tanks / the state of damage to concrete tank facilities is confirmed to be inferior to the installation of excellent wastewater draining systems, the leakage of which is verified to the underground room;

2. Verification of water leakage status of concrete walls in the left-hand direction from the entrance of a concrete wall into the underground room, and verification of the point at which the water leakage level of the entire right-hand wall is located;

3. Opinions on the inspection of measures subsequent to the verification of the status of hot spring water leakage in the state of astronomical condition (the installation of hot spring water leakages at present in plastic bags);

5. In a comprehensive examination, this building has a large part of damage to the building and outer walls, etc. due to poor building management conditions, and the installation of various pipes itself has been constructed due to a mistake in the installation of the pipes, which caused the accident to the same end, and the poor of drainage, such as electricity pipes, electrical distribution lines, fire-fighting equipment, septic tanks, sewage, etc., in the same season.