logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2017.09.21 2017가단5124900
구상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. The plaintiff is the cause of the claim in this case. The plaintiff is an insurer that has concluded an insurance contract that covers the comprehensive risk of property of the 522 multi-households located across the country with the Dansung industry. One of the above stores is the insurer that has concluded an insurance contract that covers the comprehensive risk of property of the Dansung industry. The accident occurred due to the leakage of fire-fighting water from the 2nd floor of the Danwon-gu, Suwon-gu, Suwon-si, Suwon-si, which is one of the above stores, and the above C's inventory assets, etc. are flooded. The above accident paid insurance money to the damages suffered by the Dansung Industrial Co., Ltd. which caused the damage of the Dansung due to the occurrence of the accident that connects the pipe pipes and pipes of the Donsung-si. The fire-fighting water in the pipe which was separated from each other due to the damage and caused by the defendant's negligence in charge of managing the various facilities of the above D's shopping center. However, the plaintiff did not agree with the defendant's submission of the above defense.

The above argument is without merit.

2. The plaintiff's claim of this case is dismissed as it is without merit. It is so decided as per Disposition.

arrow