(영문) 수원지방법원성남지원 2019.11.28 2018가합403726
손해배상(기)
Text

1. The Plaintiff, Defendant C, and Defendant B, jointly with Defendant C, KRW 242,925,775, and KRW 208,222,093 of the said money and each of the said money.

Reasons

1. Basic facts

A. 1) The Plaintiff is the Gwangju City D (hereinafter “instant land”).

2) On the ground, the instant building is a tree building with the size of 1st underground and 2nd ground level (hereinafter “instant building”).

In order to construct the instant building, on December 30, 2016, the construction cost was determined to be KRW 357,500,000, and the construction of the instant building was ordered to be awarded to E and F. (2) After the conclusion of the said contract, the Plaintiff obtained a construction permit from the Gwangju City Mayor on May 26, 2017, and began the construction of the instant building from June 2017.

B. On March 2018, the Plaintiff entered into a contract with Defendant B to install urban gas in the instant building (hereinafter “instant contract”) with the Plaintiff on an oral basis, around March 2018.

C. On March 5, 2018, Defendant C, an employee of Defendant B, pursuant to the instant contract, commenced the work of drilling the relevant building into the boiler room of the first floor, the kitchen, and the second floor boiler room of the instant building. In this case, the Defendant C excavated the hole with the equipment “cocon (ploiting equipment to the wall at the time of the installation of air conditioners, etc.)” used for drilling concrete, which is not the divers for trees.

그런데 피고 C이 위와 같은 천공 작업을 마친 후인 2018. 3. 5. 18:00경 위 천공작업을 한 부분에서 나무가루와 단열재가 벽 내부에서 훈소(燻燒)되다가 축열에 의해 불이 붙어, 건축 중인 이 사건 건물 벽면, 천정 등으로 번져 소훼되는 화재가 발생(이하 ‘이 사건 화재’라 한다)하였다. 라.

On March 5, 2018, the defendant (the defendant C, the same hereinafter) confirmed the judgment of the relevant criminal case was a person in charge of installing urban gas pipelines, and the victim A (the plaintiff) in Gwangju-si was a victim A (the plaintiff) who was constructed in Gwangju-si in the new site of tree houses, and the wall engineering work for installing urban gas pipelines was conducted.

The housing is located as a tree.