(영문) 서울중앙지방법원 2017.10.19 2015가합576288
채무부존재확인
Text

1. As to the Defendant-Counterclaim Plaintiff:

A. The plaintiff (Counterclaim defendant) shall be 99,198,348 won and the plaintiff (Counterclaim defendant).

Reasons

A principal lawsuit and a counterclaim shall be deemed simultaneously.

1. Facts of recognition;

A. On October 18, 2013, the Defendant published a public announcement of the construction announcement on the construction work “the construction work of installing a fall prevention facility (hereinafter “the instant first construction work”) at the section of C 2,3 lines near A-B, the upper 3 lines 1.9km, and the upper 3 lines 1.9km (hereinafter “the construction work”).

. The contents are as follows:

1. Outline of the construction work;

(a) Dried name: Installation of facilities to prevent the fall of a light-line C Hab, three lines, and the upper three lines;

(b) Design amount: 1,597,640,000 won (including value-added tax);

(c) Basic amount: A separate public notice shall be given by no later than the date preceding the date of commencing the tender (the basic amount disclosed on October 23, 2013 1,533,00,000 won according to the description in subparagraph 1-2 of subparagraph (B) shall be KRW 1,533,00.

(d) Period: 120 days from the commencement date of construction;

(e) Details of construction: Reference to attached design - 1,144m - 183m - 183ms for 3rd-line sidewalks and railing 360ms for 360ms for 3rd-line sidewalks and railing;

(f) Construction site: 11.90km A-B, C Ha two, three lines, and three lines in the vicinity of 11.900km;

2. Bidding and contracting methods;

(a)The tender is a single-year construction, and will be executed by a total electronic tender without attaching a calculation statement to the tender;

4. The site descriptions will substitute for the perusal of the plan.

- Inspection place: Korea Railroad Corporation's Seoul Metropolitan Area Headquarters's establishment (D in charge)

5. Joint contract (if necessary);

(a)Composition: Shall be a joint implementation method if it is a joint contract, and shall not exceed three enterprises, including representatives;

(b) Representative: A person qualified for participation in bidding who has the highest investment ratio.

(c) the method of submitting an agreement: will submit a national comprehensive electronic procurement system in accordance with Article 9 of the General Agreement on Electronic Procurement.

Submission deadline: October 27, 2013 18:00

6. Submission of tenders;

(a) The tender will be executed only through an electronic bid, and the electronic bid will be submitted through the National Integrated Electronic Procurement System.